In this guide we learn how to express voltages, currents and impedances as simple fractions of a base value, with clear diagrams and a full worked fault-current example.
Quick answer: In the per-unit method we divide each quantity by a chosen base value. We pick a base power for the whole system, often 100 MVA, and a base voltage in each voltage zone. Base current and base impedance then follow: I base = S base ÷ (√3 × V base) and Z base = V base² ÷ S base. In per unit, a transformer has the same impedance on both sides, so the whole network becomes one simple circuit.
Why we need the per-unit method
A real power system has many voltage levels. A generator may make power at 13.8 kV. A transformer raises it to 138 kV for the line. Another transformer lowers it again for the load. Each transformer also changes the current and the impedance by a large factor.
So a calculation in volts, amps and ohms must track every transformer ratio. One slip, and the answer is wrong by a factor of 100. So how do engineers handle a network with dozens of transformers without getting lost?
They use the per-unit method. Per unit (pu) means "as a fraction of a base value". We choose a base value, a reference size, for each quantity. Then we divide the actual value by it:
value in pu = actual value ÷ base value
For example, if the base voltage is 138 kV and the bus is at 136 kV, the voltage is 136 ÷ 138 = 0.986 pu. Per cent is the same idea times 100, so 0.986 pu is 98.6%. The animation at the top shows the effect. In kilovolts the voltages differ by ten times. In per unit they are all close to 1.0.
There is a second benefit. Equipment of very different sizes looks similar in per unit. The figure below shows four transformer reactances. Reactance, X, is the opposition to AC current caused by the magnetic field. In ohms the values spread over more than 100 times. In per unit on their own ratings they sit close together.
Think of exam marks. A score of 45 means little alone. Out of 50 it is very good. Out of 100 it is poor. So we say 90% or 45%. The per-unit method does the same for a power system. It tells us how big a value is compared with its normal size.
Base values: choose two, calculate two
Four quantities matter in a power system: power S, voltage V, current I and impedance Z. Impedance is the total opposition to AC current, made of resistance and reactance. These four are linked by the circuit laws. So we may choose only two bases freely. The other two follow.
- Base power, S base. This is a three-phase power in MVA. It is one value for the whole system. Studies often use 100 MVA because it is a round number. It does not need to match any machine rating.
- Base voltage, V base. This is the line-to-line voltage in kV. We usually pick the nominal voltage of each zone, such as 13.8 kV or 138 kV.
For a three-phase system, the two derived bases are:
I base = S base ÷ (√3 × V base)
Z base = V base² ÷ S base
With S in MVA and V in kV, the first formula gives kiloamps and the second gives ohms. The figure below shows the idea with numbers. At 100 MVA and 138 kV, I base = 100 ÷ (1.732 × 138) = 0.418 kA, or 418 A. Z base = 138² ÷ 100 = 190.4 Ω.
Writing I base = S base ÷ V base for a three-phase system. That formula is for a single-phase circuit. With a three-phase S base and a line-to-line V base, we must divide by √3 × V base. Leaving out the √3 makes every current 73% too big.
Note that Z base has no √3. The √3 terms cancel, because the phase voltage is V ÷ √3 and the power per phase is S ÷ 3. So (V ÷ √3)² ÷ (S ÷ 3) = V² ÷ S. This is also why a single-phase per-unit calculation and a three-phase one give the same per-unit numbers. We only need to use matching bases: S ÷ 3 with the line-to-neutral voltage, or S with the line-to-line voltage.
Voltage zones and transformers
Each transformer divides the network into zones. A zone is a part of the network at one voltage level. The base power is the same in every zone. But the base voltage changes at each transformer, in the same ratio as the transformer's rated voltages.
In the figure below, transformer T1 is rated 13.8/138 kV. So if zone 1 has a base of 13.8 kV, zone 2 must have a base of 138 kV. T2 brings it back to 13.8 kV in zone 3. Base current and base impedance then follow in each zone from the formulas above.
Why go to this trouble? Because it makes the transformer disappear. Take T1, rated 100 MVA with a reactance of 10%. Seen from the 13.8 kV side, its reactance is 0.10 × 1.904 = 0.190 Ω. Seen from the 138 kV side, it is 0.10 × 190.4 = 19.04 Ω. The ohms differ by 100 times, which is the turns ratio squared.
But the base impedance also differs by exactly 100 times. So the ratio is the same: 0.10 pu on both sides. The figure below shows this.
So in per unit we do not need to refer impedances across a transformer. We draw the transformer as one simple reactance. The ideal ratio part is gone. This only works when the base voltages follow the transformer ratio, as in the zones above.
Think of a map with a scale bar. A road might measure 2 cm on a small map and 20 cm on a big wall map. But both maps show the same 10 km road. The per-unit value is the real road. The ohms on each side of a transformer are just two maps at different scales.
Changing the base
Makers give the impedance of a generator or transformer in per unit or per cent on its own rating. This is called the nameplate base. But our study uses one common base, such as 100 MVA. So we must convert each value. The change-of-base formula does this:
Z pu,new = Z pu,old × (V old ÷ V new)² × (S new ÷ S old)
Here "old" means the nameplate base, and "new" means the system base. If the rated voltage equals the system base voltage, the voltage term is 1. Then only the power ratio is left. The four cards below convert transformer T2 from our worked example.
1Read the nameplate
T2 is rated 50 MVA and 132/13.2 kV, with X = 8%. So X = 0.08 pu, but on its own base.
2Fix the voltage
Our system base on that side is 138 kV, not 132 kV. Multiply by the old voltage over the new, squared: 0.9149.
3Fix the power
Our system base is 100 MVA, not 50 MVA. Multiply by the new power over the old: 2.
4Multiply
0.08 × 0.9149 × 2 = 0.1464 pu. This is T2 on our common base.
The power ratio is easy to understand. A 50 MVA transformer looks "smaller" on a 100 MVA base, so its per-unit impedance doubles. The voltage term matters when a machine is rated at a slightly different voltage from the zone base. Here 132 kV against 138 kV changes the result by about 8.5%.
Turning the ratios upside down. The voltage ratio is old over new, but the power ratio is new over old. A quick check: a bigger S base gives bigger per-unit impedances, and a bigger V base gives smaller ones.
A 50 MVA, 138 kV transformer with X = 10% on its own rating, carrying its full-load current of 209 A. Base voltage is fixed at 138 kV.
Move the slider in the box above. The per-unit numbers change with the base. The real reactance stays 38.1 Ω and the real current stays 209 A. The per-unit voltage drop, I × X, also stays at 0.10 pu. The base changes the numbers, but never the physics.
Worked example: from one-line diagram to fault current
Now we put it all together. The figure below is a small 60 Hz system. A generator feeds a step-up transformer, a 40 km line at 138 kV, a step-down transformer and a load. We want the current for a three-phase fault at bus 4.
Step 1. Choose the bases. We use S base = 100 MVA for the whole system. In zone 1 (generator side) we choose V base = 13.8 kV. T1 then gives 138 kV in zone 2. T2 is rated 132/13.2 kV, a ratio of 10, so zone 3 gets 138 ÷ 10 = 13.8 kV.
Step 2. Find the base values.
- Zone 1 and zone 3: Z base = 13.8² ÷ 100 = 1.904 Ω. I base = 100,000 ÷ (1.732 × 13.8) ≈ 4,184 A.
- Zone 2: Z base = 138² ÷ 100 = 190.4 Ω. I base ≈ 418 A.
Step 3. Convert each part to the 100 MVA base.
- Generator: X″ = 0.20 × (13.8 ÷ 13.8)² × (100 ÷ 80) = 0.250 pu. X″ is the subtransient reactance, the low reactance a generator shows in the first few cycles of a fault. Large generators are typically 0.15 to 0.25 pu.
- T1: rated 100 MVA and 13.8/138 kV, the same as the base. So X = 0.100 pu, unchanged.
- Line: X = 20 Ω ÷ 190.4 Ω = 0.105 pu. A line is given in ohms, so we divide by Z base of its zone. About 0.5 Ω/km is a typical value for a 60 Hz line at this voltage.
- T2: 0.146 pu, from the four cards above.
Step 4. Draw the impedance diagram and add. The figure below shows the per-unit circuit. Before the fault, we take the voltage as 1.0 pu and ignore the small load current. This is a common first estimate. All four reactances are in series:
X total = 0.250 + 0.100 + 0.105 + 0.146 = 0.601 pu
Step 5. Find the fault current. I fault = 1.0 ÷ 0.601 = 1.66 pu. To get amps, multiply by I base of the zone where the fault is. Bus 4 is in zone 3, so I fault = 1.66 × 4,184 A ≈ 6.96 kA. The fault power is 1.66 × 100 MVA ≈ 166 MVA.
Notice what we did not do. We never referred an ohm value across a transformer. We simply added four numbers. That is the power of the per-unit method. For a real study we would also include resistance and the X/R ratio, the source network and motor contributions. But the method stays the same.
Think of shopping in four countries with four currencies. To add up the bill, we first change every price into one currency. The change-of-base formula is the exchange rate. Once every impedance is on the 100 MVA base, we just add them.
Where engineers use per unit
Almost every power system study works in per unit. Software tools do it inside, even when they show results in kV and kA.
- Short-circuit studies. As in our example, we add per-unit impedances to find fault currents. These set breaker ratings and protection settings.
- Load flow. A load flow calculates the voltage at every bus and the power in every line. Bus voltages in pu show problems at a glance. Planners often aim to keep them near 1.0 pu, for example within about ±5%.
- Network models. The Z bus and Y bus matrices, tables that describe how every bus connects to every other, are built from per-unit impedances.
- Motor starting. A motor draws several times its rated current when it starts. Per unit makes it easy to find the voltage dip this causes on the bus.
- Machine data. Makers give generator, motor and transformer impedances in per cent or per unit on their own rating. This lets us compare machines of any size.
Key takeaways
- Per unit means actual value ÷ base value. It turns big, mixed numbers into simple fractions near 1.
- We choose S base (one value for the whole system, often 100 MVA) and V base (one per voltage zone). The base voltage changes at each transformer by its voltage ratio.
- For three-phase systems, I base = S base ÷ (√3 × V base) and Z base = V base² ÷ S base.
- A transformer has the same per-unit impedance on both sides, so it becomes a simple series reactance.
- To move nameplate data to the system base, use Z pu,new = Z pu,old × (V old ÷ V new)² × (S new ÷ S old).
- In our example, four per-unit reactances add to 0.601 pu, so a fault at bus 4 draws 1.66 pu, about 6.96 kA at 13.8 kV.